The front boardwalk has been built!  We still need to build a ramp.

The holding water tank has been installed.  We will be pumping rain water into this tank.  This tank will fill a tote inside the greenhouse.  The fog is created from the tote.

Some shelving has been installed.  The rest of the greenhouse will be used for hanging bags.

Subscribe to email newsletter

You have Successfully Subscribed!

Pin It on Pinterest

Share This