The front boardwalk has been built! We still need to build a ramp.
The holding water tank has been installed. We will be pumping rain water into this tank. This tank will fill a tote inside the greenhouse. The fog is created from the tote.
Some shelving has been installed. The rest of the greenhouse will be used for hanging bags.